All categories
Project Name:
CPECC Russia AGPP project
Project Location: Amur, Russia
Products Involved: Adsorption Tower
Project Introduction:
The core equipment of the Russian Amur natural gas AGPP project has a total of 39 adsorption towers for phases 1-5, with a wall thickness of 142mm, using ANSYS stress analysis and design, and CU-TR certification.
The core equipment of the Russian Amur natural gas AGPP project has a total of 39 adsorption towers for phases 1-5, with a wall thickness of 142mm, using ANSYS stress analysis and design, and CU-TR certification.
E-mail:
carlos.chen@frhe.cn
1/1
Number of views:
1000
CPECC Russia AGPP project
Products Involved: Adsorption Tower
Retail price
0.0
元
Market price
0.0
元
Number of views:
1000
Product serial number
Category
Sophisticated equipment for energy
Quantity
-
+
Stock:
0
1
产品描述
E-mail:
carlos.chen@frhe.cn
Project Introduction:
The core equipment of the Russian Amur natural gas AGPP project has a total of 39 adsorption towers for phases 1-5, with a wall thickness of 142mm, using ANSYS stress analysis and design, and CU-TR certification.
The core equipment of the Russian Amur natural gas AGPP project has a total of 39 adsorption towers for phases 1-5, with a wall thickness of 142mm, using ANSYS stress analysis and design, and CU-TR certification.
搜索